Thursday, 10 May 2012

Post-Production

As I was the Producer My Main role was insuring that everything as planned out and scheduled for the shoot so I took a slightly back seat during the edit, and giving my opinion and help when needed. I decided to take this time to ensure that the Production  Folder contained all work that needed to be done and chase up the others in doing the paper work required from their roles.

Here is a Shooting Log that Joe produced:



Date/ Time Scene Type of Shot Location Description
2/5/12- 5.00 AM Sun Rise Extreme Wide Norfolk Heritage Park A simple still shot showing the city go from dark to light
2/5/12- 5.00 AM Clouds Wide Norfolk Heritage Park A still shot again just showing the clouds gradually move across the sky
2/5/12- 9.00 AM Morning Traffic Wides/Mid shots and CU Drake House Way Lots of shots of traffic passing, to show sheffield getting u for the day.
2/5/12- 9.30 AM Office scene Static Mid shot Knutton Road Studios A still shot of John at work having lots of work given to him
2/5/12- 9.30 AM Office scene CU Knutton Road Studios John answering the phone in a depressed manor
2/5/12- 10.00 AM Office scene Mid Shot Knutton Road Studios John going into a day dream with his head flat on his desk
2/5/12- 10.00 AM Office scene Mid Shot Knutton Road Studios John in his day dream playing with his horrible boss
2/5/12- 11.00 AM Office scene extreme CU Knutton Road Studios Johns boss being spun around on a chair looking up at his face
2/5/12- 11.00 AM Office scene Mid Shot Knutton Road Studios John being handed even more work aswell as being told he has to work Bank Holiday
2/5/12- 12.00 AM Office scene Tilted Mid Shot Knutton Road Studios John going mad throwing his work around and graffiting on the walls (day dream)
2/5/12- 12.00 AM Office scene Static Mid shot Knutton Road Studios John entering and leaving for work via the lift. Busy scene
2/5/12- 12.00 AM Outside office Wide Shot Knutton Road Studios Panning shots of the office blocks showing our location
3/5/12- 2.00 PM Early Morning Breakfast Mid Shot Kinnaird Road A few shots of John getting ready for work whilst his wife constantly nagging in his ear
3/5/12- 2.00 PM Leaving for work Mid CU Kinnaird Road John opening his front door and slowly leaving to work
3/5/12- 2.00 PM Returning from work Mid CU Kinnaird Road The same shot as when he leaves, john still looking really depressed and fed up
3/5/12- 2.00 PM Evening Dinner Mid Shot Kinnaird Road Amy walking around the kitch moaning at John for bill aswell as her going out and him having to make his own tea. John now lookinng really depressed
3/5/12- 3.00 PM Evening Dinner CU Kinnaird Road Close shot of John drinking his wine as well as some mood shots
3/5/12- 3.00 PM Evening Dinner Mid Shot Kinnaird Road John staring in a the mirror then goes into another day dream
3/5/12- 3.00 PM Living Room CU mid shot Kinnaird Road John in his day dream having his wife nagging him, he then chokes her to the ground
3/5/12- 4.00 PM Leaving for Good Mid Shot Kinnaird Road John opening his front door relieved and feeling free, he slowly take a breath in then starts walking away from the house
3/5/12- 6.00 PM Leaving for Good Wide Shot Norfolk Heritage Park John walking down through the park on his own into the distance
3/5/12- 6.00 PM Leaving for Good CU Norfolk Heritage Park Some close up of him sighing with relief then setting of walking into the distance


Here a Song Log that Jordan and Paul Produced:


Sound Log


Film: ‘Escaping’



Sound Recordist(s): Jordan Deakin, Paul Manning

Sound Editor(s): Jordan Deakin, Paul Manning



File Name / Description



Drama Original Sounds 



01             Early Bird Song 00:04:17 Gentle bird song

02             Early Bird City 01:21:09 Gentle bird song + distant city sounds

03             Early Birds with Quacks Early morning birds with quacks

04             Scene 6 Take 1 Keyboard tapping, boss “by four”

05             Office phones ringing

06             Scene 6 Take 2

07             Scene 6 Take 3

08             Scene 6 Take 4

09             Montage Take 1

10             Montage 2 Red phone call

11             Montage 3

12             Montage Take 4 “Holiday declined”

13             Montage Take 5

14             Printer noise (on set)

15             Dream Sequence Take 1 Office

16             Office Dream Take 2 

17             Office Dream Take 4 General noise

18             Dream Take 5 “Cowboy”

19             Dream 6 “Day off”

20             Dream 7 “Day off” (best version)

21             Traffic

22             Traffic 2
23             Traffic 3

24             Traffic 4 Longer cut 01:48:14

25             Traffic 5 Moped



Supplementary 



01             Breakfast Sighs

02             Axe Murderer Take 1

03             Axe Murderer Take 2

04             Old Codgers

05             Got to get to work

06             Job up yer arse

07             Phone fucking eyeballs

08             Pauline payslip

09             Sandra’s Chlamydia

10             Paul Ruler

11             TGI Components “nutsack”

12             (Urgh!) For God’s sake

13             Sandra take it for once

14             Nagging

15             Didn’t have time to make yer tea

16             Continuous nagging

17             Multiple nagging

18             Multiple nagging 2

19             Throttling

20             Printer (Sheaf)

21             Sheaf Phone 




Day Two Filming 



01             Pub with Lauren (test)

02             Scene 2 Take 2 Pub with Lauren

03             Scene 2 Take 3

04             Scene 2 Take 5 “Bills”

05             Bills 2

06             How was your day?

07             How was your day? 2

08             How was your day? 3

09             You’re late!